Altro Case Studies
Celtic Manor Hotel, Newport Cereal Partners

“The old wall and floor tiles were a nightmare to maintain and keep clean, and the new surfaces have made a huge difference. Our kitchen is no different from many others throughout the country, with small adjoining preparatory and wash areas which can be awkward to clean, but having the smooth surfaces, the process is simple.”

Trevor Jones,
Head Chef
Celtic Manor Hotel, Newport

“We chose Altro as we know their products are cost effective and won’t cause headaches over hygiene. We’re more than happy with the completed project.”

Neil Anstiss,
Engineering Site Services Manager
Cereal Partners

Holiday Inn David Lloyd Leisure

“The problem we had with using ceramic tiles in the past was that, in order to maintain hygiene levels, the grouting joints needed renewing every three to four years. Altro proved to be the ideal solution and in two years I can honestly say we’ve had no problems. Altro Walling and Flooring has performed faultlessly. Cleaning is easy too and we have eliminated the problem of older grouting joints absorbing dirt”

Peter Bayliss,
Executive Chef
Holiday Inn

“In the past we have used ceramic tiles on the floors and walls of our shower areas but we were keen to move away from the problems of cleaning tiles, re-grouting and also of tiles popping out. Altro provided the solution we needed – the product is easy to clean and maintain, all of which saves us money. And because it’s supplied in single sheets, we have no grouting joints to clean, even between the floor and the walls.”

Steve Jones,
Interior Design
at David Lloyd Leisure

Click here to download CSIRO statement on Slip Resistance. (110kb)

Want to stay OPEN FOR BUSINESS while you lay Altro Safety Flooring?
Click here for information on the Altro Quicklay System.